Skip to content

Plan work

Track work through stages

Follow each Tasket task through the steps your team repeats, such as Design and Review. Add stages to a project, and move tasks through them.

Stages in Tasket are the steps your team's work goes through, such as Design, Build, and Review. The project's Stages tab shows each stage as a column of tasks. A task can be in several stages at once, and is Active or Done in each one separately.

Completing a task doesn't mark its stages done.

Turn on stages

Stages are off in every new project, so the project has no Stages tab at first. Any team member can turn them on. To turn on Stages, follow these steps:

  1. In the project, click Settings > Features.
  2. Turn on Enable Stages. The Stages tab appears.

Add a stage

To add a stage, follow these steps:

  1. In the project, click the Stages tab.
  2. Click +Add Stage. Tasket adds a stage called Stage 1.
  3. Click Stage options > Rename, and enter a name, for example Design.

To change the order of stages, click Stage options > Move stage.

Move a task through stages

To move a task through stages, follow these steps:

  1. Open the task and click the Stages pill, for example Stages 0/0/3. The Manage stages panel lists the project's stages.
  2. Next to a stage, for example Design, click Add. The task is Active in that stage.
  3. When that step is finished, click Done next to the stage. The task is Done in that stage.

The pill counts the stages the task is done in, the stages it's active in, and the project's total. In the panel, Remove takes the task out of a stage, and Restart makes a done stage active again.

On the Stages tab, each stage shows its active tasks. To see done tasks too, switch the stage's filter to All or Done.

Next steps