# Track work through stages

_Stages_ in Tasket are the steps your team's work goes through, such as Design, Build, and Review. The project's **Stages** tab shows each stage as a column of tasks. A task can be in several stages at once, and is _Active_ or _Done_ in each one separately.

Completing a task doesn't mark its stages done.

## Turn on stages

Stages are off in every new project, so the project has no **Stages** tab at first. Any team member can turn them on. To turn on Stages, follow these steps:

1. In the project, click **Settings** > **Features**.
2. Turn on **Enable Stages**. The **Stages** tab appears.

## Add a stage

To add a stage, follow these steps:

1. In the project, click the **Stages** tab.
2. Click **+Add Stage**. Tasket adds a stage called **Stage 1**.
3. Click **Stage options** > **Rename**, and enter a name, for example `Design`.

To change the order of stages, click **Stage options** > **Move stage**.

## Move a task through stages

To move a task through stages, follow these steps:

1. Open the task and click the **Stages** pill, for example **Stages 0/0/3**. The **Manage stages** panel lists the project's stages.
2. Next to a stage, for example **Design**, click **Add**. The task is _Active_ in that stage.
3. When that step is finished, click **Done** next to the stage. The task is _Done_ in that stage.

The pill counts the stages the task is done in, the stages it's active in, and the project's total. In the panel, **Remove** takes the task out of a stage, and **Restart** makes a done stage active again.

On the **Stages** tab, each stage shows its active tasks. To see done tasks too, switch the stage's filter to **All** or **Done**.

## Next steps

- [Plan work in sprints](/tasket/guides/plan-work-in-sprints): plan the same tasks in fixed periods.
- [Link related tasks](/tasket/guides/link-tasks): break a task into smaller tasks that move through stages on their own.